Today

Dashboard

Mobile technician view

Home

Machine availability 91.8% +3.4% vs last week
Preventive compliance 86% 4 routines overdue
PM due today 9 3 before noon
Downtime hours 4.6 h Target below 6 h

Today's priority list

Top urgent tasks this shift

WO-1050PK-330 Palletizer
Now | Ari Singh
WO-1048CV-104 Case Conveyor
10:30 | Mira Chen
WO-1049FL-018 Bottle Filler
12:00 | Jon Bell
WO-1051MX-220 Mixer
14:45 | Lena Park
WO-1052UT-077 Air Header
16:10 | Sam Ortega

Risk ranking

Top 5 risky equipment this shift

CV-104 Case ConveyorRisk 87 | bearing heat
PK-330 PalletizerRisk 79 | sensor fault
LB-041 LabelerRisk 74 | belt wear
UT-077 Air HeaderRisk 68 | leak survey
CH-006 ChillerRisk 61 | certificate review

Today's workload

Live task flow by status

New
In progress
Completed
Closed

Trend view

7-day and 30-day KPI direction

Availability91.8%
7d +2.1 | 30d +4.4
Open WO27
7d -6 | target 18
PM compliance86%
7d +5 | target 95%
MTTR / MTBF2.4h / 14d
30d steady

Team feed

Technician notes and field updates

Tasks

Equipment

Certifications

Track equipment certificates, expiry dates, inspections, and renewal status.

Authority Days Remaining Certificate Details

Production Inventory

Production Inventory (spare parts, consumables) and Office Inventory (office items, consumables): stock, locations and prices.

Image Category Actions

Inventory Replenishment Queue

Reorder recommendations and procurement tracking using existing stock, suppliers, and purchase requests.

Stage 8E-3 - Procurement Tracking

Material Requests

Internal warehouse request queue. Maintainly does not create Purchase Orders.

Supplier's List

Approved supplier items, references, prices, and lead times for purchasing.

Supplier category

Factory Floor

Machines, material stores and spare parts. Switch layers on and off; click anything to see what is there.

Pantry
Reception
Main
Office
Store Inventory
Glass inventory
Level 1 main production floor
Forklift / Container Unloading
Reception
Small lorry
loading / unloading
Customer Loading /
Unloading
2A-2D Cutting
9 Lamination
20 Compressor
21 Dryer
2B
2C
2D
7AManual waterjet
7BAutomated
8B
8C
8D
5A
5B
5CWashing
5D
3A
3B
3C
3D
3E
4A
4B
4C
4D
4E
4F
4G
9A
9B
9C
9E
9FEVA
9G
12B
12C
11A
11B
13A
13B
14
15
16
17
20C
20D
20E
20F
21C
Lea Hin Inventory
B
C
E
D
Level 2
20AAir compressor
20BTempered
21ADryer
21BDryer
Bearing 6205-2RS
Photoeye sensor M18
EPDM seal kit
Valve gasket 1 in.
Gearbox oil ISO 220
Sanitizer wipes
Thread locker
PTFE tape

Glass / PVB / Lea Hin Floor

Duplicated factory floor page for Glass Inventory, PVB Inventory, and Lea Hin Inventory locations.

Locations

Racks, cabinets and loose areas placed on the factory map. Codes SP-R.., SP-C.., SP-L..

Hierarchy

Location Register

Materials Inventory

Imported from Glass Inventory and PVB Inventory records dated 1 June 2026.

Low Stock alarm Review Items with zero stock, low balance, or high open percentage need attention.
Incoming Stocks Tracked Incoming and daily movement columns from the June 2026 source records.

Materials usage chart

Combined quantity usage by default, with section and period filters.

History

Added and removed inventory items with date and time.

Calendar

Maintenance, stock and leave in one place. Tap a day to see or add.

Pending approvals

Leave and appointment requests waiting for review.

Approval history

Maintenance Checklist

PM templates, scheduling, execution, calendar, and completion history.

Certifications

Lifting gear, lifting machines and air receivers: certificates, expiry dates and documents.

Users & Roles

Who can see and do what. Roles are starting points; each person can be adjusted.

New task

Detail entry for maintenance work.

Maintenance Date & Time

Corrective Failure Tracking

Optional for PM. Used for equipment reliability analytics.

Confirm Spare Part Consumption

Review actual spare parts consumed before completing the Work Order.

Equipment import

Preview hierarchy import

Edit sub-calendars

Rename activities and adjust colors.

Choose month

Jump directly to a month and year.

Add request

Register a pending leave or appointment request.

Storage locations

Spare-part locations are placed on the factory map.

Approved structureArea -> Unit -> Level

Maintenance Store

Maintenance Store

Maintenance Store

Storage unit typesCAB / RACK / OPEN

CAB

RACK

OPEN

Edit map item

Edit text and colour. Resize blocks from their corners on the floor plan.